The Drywall Process
There is a process to correctly install drywall. Please read and browse the photos below to see different stages from beginning to completion.
First we âhangâ, or install the sheets. âSheet Rockâ is a brand name, like Kleenex. Lets call it âRockâ. Notice the screw pattern and also note the screws are set at the right depth.
Not too deep, because if the paper is ripped through, the screw has done no good. That layer of paper is the structure that holds it in place. Screw guns are awesome. (Drill slingers take note.) If the screw is hanging out of the rock, that will need to be turned in. Oh my aching wrist⦠1-1/4 inch screws are sufficient thank you. Yes, even for the 5/8â³ on the ceiling, we call the âlidâ.
One of the photos shows how we take the time to vee the joints out. âButtâ joints are those that are at the 4 foot height. The âflatâ or the recessed edge is the length of the sheet. All joints are checked for imperfections and cut out with a utility knife. We refer to that as cleaning.
A crucial point most tapers do not do (however the book tells us this is the way it should be done) is that all joints should be filled with a fast setting, powder-form mud called âDurabondâ.
Another USG product, recommended by the manufacturer as âjoint reinforcementâ. I cannot stress how vital this step is to a lasting job. If this step is skipped, in time, those joints will âpopâ and usually occurs in less than two years.